Greensburg Municipal Airport New Runway 1-19

Greensburg, IN
Greensburg Board of Aviation Commissioners

Summary:

The Greensburg Board of Aviation Commissioners desired a larger runway able to accommodate business jet and cargo traffic serving local businesses and industries, such as the Honda manufacturing plant. The new runway was constructed in two phases. Phase I required over 400,000 cubic yards of earthwork grading across 90 acres of the site in preparation for paving. A new storm sewer network was constructed with 8,780 linear feet of concrete pipe. Phase II included construction of a cement stabilized base course, aggregate base course, and asphalt paving. A new electrical vault and LED runway lights and navigational aids were installed. The new runway is 5,405’ in length and 100’ wide.

Awards

ACEC (American Council of Engineering Companies) Merit Award